Get Your Quote Call 020 7946 0958
Commercial / High-Rise Riverside Tower

Riverside Tower

Floor-by-floor compartmentation survey and remedial fire-stopping across a 22-storey City office tower, closing 340+ breaches ahead of a Building Safety Act audit.

City of LondonLocation
Compartmentation Survey & RepairsScope
Residential / Housing Association Grangewood Estate

Grangewood Estate

Inspection, repair and replacement of FD30 doorsets across 12 residential blocks for a London housing association, restoring certification across the estate.

East LondonLocation
Fire Door Installation & RepairsScope
Industrial / Warehousing Thameside Logistics Park

Thameside Logistics Park

Design and installation of a new BS 5839-compliant fire alarm system across a 40,000 sq ft distribution warehouse, commissioned with zero disruption to operations.

South East LondonLocation
Fire Alarm InstallationScope
Commercial / Office Corridor House

Corridor House

Full retrofit of maintained emergency lighting across escape routes and open-plan floors, tested and certified to BS 5266 within a live occupied building.

SouthwarkLocation
Emergency Lighting InstallationScope
Mixed-Use Development Skyline Quarter

Skyline Quarter

Bespoke fire strategy plan prepared for a new mixed-use development, aligning means of escape and compartmentation with Building Safety Act evidence requirements.

Canary WharfLocation
Fire Strategy PlansScope
Commercial / Multi-Tenant Dockside Business Centre

Dockside Business Centre

Site-wide extinguisher audit, supply and annual servicing programme across a multi-tenant business centre, standardising cover across all floors.

DocklandsLocation
Fire Extinguisher SalesScope

Need fire protection work carried out to a standard that passes audit?

Speak to our team about a survey, repair or installation programme for your building.